Industrial capability

Industrial Strainers

Basket, Y and temporary strainers made to specified line sizes and service conditions.

Industrial Strainers

Standard work procedure

Project-specific code, client specification and approved inspection plan take precedence.

Data-sheet reviewFluid, pressure, temperature, mesh and allowable pressure drop are confirmed.
Material verificationBody, screen and connection materials are checked.
FabricationCutting, forming, machining and fit-up follow approved drawings.
Welding & inspectionQualified welding and specified NDE are completed.
Pressure & functional testLeak tightness, screen fit and flow orientation are verified.
PreservationInternal cleanliness, coating and shipping protection are applied.

Applicable standards

ASME B31.3ASME B16.5ASME Section IXASME Section VIII where applicable

Quality & safety controls

Material traceability, approved drawings, qualified personnel, calibrated inspection equipment, documented hold points and final turnover records are applied to the contract scope.

WhatsApp Sales