Industrial capability
Storage Tanks
Shop and field fabrication, repair and maintenance of storage and fuel tanks, with controlled welding, inspection and testing.

Standard work procedure
Project-specific code, client specification and approved inspection plan take precedence.
Design reviewCapacity, materials, corrosion allowance and appurtenances are verified.
Material controlPlate identification, certificates and storage are controlled.
Plate preparationCutting, rolling, edge preparation and templates are checked.
Erection & weldingSequence, alignment, distortion and welding parameters are controlled.
Inspection & testingVT/NDE, vacuum box, hydrotest and settlement checks are completed as applicable.
Coating & dossierSurface preparation, coating and turnover records are finalized.
Applicable standards
Quality & safety controls
Material traceability, approved drawings, qualified personnel, calibrated inspection equipment, documented hold points and final turnover records are applied to the contract scope.
